We arrange surveys and price wall tie replacement throughout Greater London. Much of Greater London sits on clay that shrinks in dry summers and swells in wet winters, and we take that into account before recommending a method.

Guide price from£2,250per house inc VAT

Drilling a mortar joint for a remedial wall tie on a 1960s cavity wall
Area
Greater London
Pricing region
London
Ground
Shrinkable clay widespread
Towns listed
32

What is the ground like in Greater London?

Most of Greater London sits on London Clay, among the most shrinkage-prone ground in the UK, with river gravels along the Thames. Subsidence claims here are among the most frequent in the country, especially after dry summers and near street and garden trees.

Ground movement here is more often linked to soils, drains and trees than to mining. Typical buildings in Greater London: Victorian and Edwardian terraces with shallow footings, inter-war semis in the outer boroughs, and converted flats and mansion blocks.

Symptoms that point to wall tie replacement

  • The roof edge or verge lifting slightly above the brickwork
  • A house built before the 1980s on an exposed or coastal site
  • Outer brickwork bowing or bulging, often worst near the top
  • Mortar joints that look wider or opened up on one elevation

Guide prices for wall tie replacement in Greater London

The ranges below reflect typical London costs for wall tie replacement, including VAT. Scaffold, access and making good can push a job to the top of the range.

Guide prices inc VAT on London rates. Items marked est. are our estimates.
ItemGuide pricePer
Mid-terrace houseest.£2,250 – £4,400per house
Semi-detached house£3,100 – £6,250per house
Detached houseest.£4,400 – £8,750per house
Scaffolding where neededest.£750 – £2,250per elevation

Methods for wall tie replacement

Partial rebuild of the outer leaf

If a section of the outer leaf has bulged too far to be tied back, it is carefully taken down and rebuilt with new ties built in as the work goes up. This is uncommon, and is usually limited to a gable top, a parapet or a panel under a window.

Best for: Outer leaf too distorted to tie back safely

Isolating the old ties

Where the old ties are swelling and cracking the brickwork, fitting new ties alone may not stop further damage. Each old tie can be isolated, usually by cutting it through within the cavity or sleeving its outer end, so it can no longer lift the outer leaf as it continues to corrode.

Best for: Thick mild steel ties still causing horizontal cracking

Removing old ties and rebedding

On badly cracked elevations the old ties are cut out from the outer face, the joints raked and rebedded, and the brickwork repointed. It is more work than isolation but removes the source of expansion entirely. An engineer or the survey report usually specifies where this is needed.

Best for: Elevations with severe cracking or lifting

From first photo to finished repair

  1. Tie survey

    A metal detector locates the existing ties and shows their pattern. Small holes are then drilled at sample points and a borescope passed into the cavity to see the tie condition, type and embedment. The holes are made good afterwards.

  2. Access

    Ties are fitted across the whole of each affected elevation, so scaffold or a tower is usually needed above ground floor. We plan access around conservatories, extensions, neighbours’ land and any parking that must be suspended.

  3. Install the new ties

    New stainless ties are drilled and fixed to the specified grid, with closer spacing around windows, doors and the roofline. Sample ties can be pull-tested to confirm they are holding in your particular brick and block.

Wall tie replacement: corroded ties isolated and new remedial ties fixed across the cavityCAVITYOLD TIECORRODEDNEW REMEDIALTIEINDICATIVE · NOT TO SCALE
Wall tie replacement: corroded ties isolated and new remedial ties fixed across the cavity. Indicative drawing, not to scale.

Do you need approval for wall tie replacement in England?

Like-for-like repairs such as crack stitching and repointing do not usually need building control approval in England, but anything that changes or strengthens the structure, such as underpinning or rebuilding a wall, does. If the work touches a party wall, the Party Wall etc. Act 1996 may apply.

Wall tie replacement near you in Greater London

Frequently asked questions

Does the ground around Croydon cause cracking?

Most of Greater London sits on London Clay, among the most shrinkage-prone ground in the UK, with river gravels along the Thames. Subsidence claims here are among the most frequent in the country, especially after dry summers and near street and garden trees. Ground movement here is more often linked to soils, drains and trees than to mining. Only an investigation on site can say why a particular building has moved.

How much will wall tie replacement cost in Greater London?

On London rates, wall tie replacement starts from about £2,250 per house, including VAT. The written price depends on the extent of the damage, access and whether an engineer or building control is needed.

Which houses are most at risk of wall tie failure?

Cavity-walled houses built before the 1980s are most at risk, especially those with mild steel ties, black ash mortar or an exposed position. Coastal and hilltop houses, and elevations facing the prevailing weather, tend to fail first.

Can wall ties be replaced on a rendered house?

Yes, new ties can be fitted through render, with each drill hole made good afterwards. The repairs can show on painted render, so redecoration of the affected elevation is often worth including. Render can also hide the cracking pattern, so a survey matters more.

Do all walls of the house need new ties?

Not necessarily, because ties often fail on one exposed elevation long before the others. The survey checks each wall, and the quote covers only the elevations where ties have failed or are close to it. Sheltered walls may simply be noted for future checks.

More repairs we carry out in Greater London

Next step

Send us photos of the crack or movement

A free initial assessment from your photos, then a no-obligation written quote. If an engineer, drain survey or monitoring is needed first, we say so before you spend anything.

CallGet a quote