Structural repairs across England, Wales, mainland Scotland and Northern Ireland · Free initial assessment from your photos0800 088 6341

Shropshire · England

Underpinning in Shropshire

Shropshire has its own mix of ground and building types, and that shapes how underpinning is done here. Clay soils are found in parts of Shropshire.

Guide price from£1,000per metre of wall inc VAT

Underpinning bay excavated beneath a brick house footing with fresh concrete placed
Area
Shropshire
Pricing region
West Midlands
Ground
Clay in parts
Towns listed
3

Is Shropshire prone to ground movement?

Shropshire has very varied rock, from Mercia Mudstone on the north Shropshire plain to the Coalbrookdale coalfield under Telford, where historic shallow coal, clay and ironstone workings are widespread.

Parts of Shropshire lie on a former coalfield, so a coal mining search is worth checking if movement has no obvious cause. Across Shropshire, most homes are timber-framed and brick town houses, industrial terraces around Telford, and new-town estates.

Guide prices for underpinning in Shropshire

The ranges below reflect typical West Midlands costs for underpinning, including VAT. Scaffold, access and making good can push a job to the top of the range.

Guide prices inc VAT on West Midlands rates. Items marked est. are our estimates.
ItemGuide pricePer
Mass-concrete underpinning£1,000 – £1,500per metre of wall
Beam-and-base underpinning£1,500 – £2,500per metre of wall
Mini-piled underpinning£2,000 – £3,500per metre of wall
Engineer's design and building control feesest.£800 – £2,500per scheme

Methods for underpinning

Mini-piled underpinning

Small-diameter piles are driven or bored down to firm ground and linked by a reinforced beam or needles that pick up the wall. Compact rigs fit through narrow access, and the method reaches depths that would be impractical to excavate by hand.

Best for: Deep soft ground, tree roots, or restricted access

Beam-and-base underpinning

A reinforced concrete beam is cast beneath or alongside the existing footing and carries the wall onto mass concrete bases at intervals. It spreads load well across variable ground and can mean less digging than continuous underpinning along the whole wall.

Best for: Longer runs of wall or heavier loads over variable ground

Mass concrete underpinning

The traditional method. Short sections under the wall are dug out in a set sequence, usually about a metre at a time, and filled with concrete before the next section is opened. It suits moderate depths and good access, and it needs little specialist plant.

Best for: Shallow failures on firm ground found at moderate depth

From first photo to finished repair

  1. Fixed written price

    With the design in hand we confirm a fixed price in writing, setting out the method, the length of wall, access arrangements and the making good. For insurance work we can price to the loss adjuster’s or engineer’s schedule.

  2. Excavation and concrete

    Work runs in the sequence the engineer sets so the wall is never left unsupported over a long length. Building control inspects the excavations before concrete goes in, and each section is dry-packed tight to the footing above.

  3. Crack repairs and handover

    Once the new foundation has cured, cracks are stitched and repointed, inside walls are made good, and paths or patios disturbed by the dig are reinstated. You receive the building control completion paperwork for your records.

Symptoms that point to underpinning

  • One corner of the house visibly lower than the others
  • Floors sloping noticeably towards one external wall
  • A large tree nearby that cannot be removed or reduced
  • Movement continuing through more than one winter of monitoring
Underpinning: new concrete placed in sequenced bays beneath the old footing1324TO FIRMGROUNDOLD FOOTINGNEW UNDERPININ BAYSINDICATIVE · NOT TO SCALE
Underpinning: new concrete placed in sequenced bays beneath the old footing. Indicative drawing, not to scale.

Do you need approval for underpinning in England?

In England, underpinning and other work that alters or strengthens a wall or foundation is building work under the Building Regulations (Part A, structure), so building control approves and inspects it. Like-for-like repairs often are not, and we tell you which applies before a price is agreed. Work to a party wall, or excavation close to a neighbour’s foundations, can also need a notice under the Party Wall etc. Act 1996.

Underpinning near you in Shropshire

Frequently asked questions

Does the ground around Telford cause cracking?

Shropshire has very varied rock, from Mercia Mudstone on the north Shropshire plain to the Coalbrookdale coalfield under Telford, where historic shallow coal, clay and ironstone workings are widespread. Parts of Shropshire lie on a former coalfield, so a coal mining search is worth checking if movement has no obvious cause. Only an investigation on site can say why a particular building has moved.

How much will underpinning cost in Shropshire?

On West Midlands rates, underpinning starts from about £1,000 per metre of wall, including VAT. The written price depends on the extent of the damage, access and whether an engineer or building control is needed.

Can you underpin only part of a house?

Yes, partial underpinning of one corner or one wall is common, though the engineer must think about the junction with the unstrengthened part. A sudden change in foundation depth can cause new cracking, so the scheme may step down gradually or include a movement joint.

Will underpinning affect selling my house?

It needs explaining to buyers, but a properly documented scheme is far better than unresolved movement. Keep the engineer’s design, the building control completion certificate and any insurance paperwork. Lenders and surveyors will usually ask for these before agreeing a sale.

Does underpinning need building control approval?

Yes, underpinning is building work and needs approval and inspections in England and Wales, a building warrant in Scotland, and council building control in Northern Ireland. Inspectors usually check the excavations before concrete is poured. We deal with building control as part of the job.

More repairs we carry out in Shropshire

Next step

Send us photos of the crack or movement

A free initial assessment from your photos, then a no-obligation written quote. If an engineer, drain survey or monitoring is needed first, we say so before you spend anything.

CallGet a quote