Structural repairs across England, Wales, mainland Scotland and Northern Ireland · Free initial assessment from your photos0800 088 6341

Calne · Wiltshire

Extension pulling away repairs in Calne

Rear and side extensions are common across Calne, and so is the crack where new meets old. Usually it reflects the two parts sitting on different foundations, and the first question is whether the gap is still opening.

Guide price from£620per junction inc VAT

Rear brick extension with a tapered crack at the joint with the house
Postcodes
SN11
Population
about 17,000
Area
Wiltshire
Pricing region
South West

How do local ground conditions affect extension pulling away repairs in Calne?

Postcode districts SN11 cover Calne, a Wiltshire town of about 17,000 people. If you are just outside Calne, we also cover Chippenham (5 miles), Devizes (6 miles) and Melksham (7 miles).

Wiltshire has a mix of ground, with clay in some places and firmer rock in others. Ground movement here is more often linked to soils, drains and trees than to mining. Typical buildings in Wiltshire: Stone cottages, railway terraces in Swindon, and large post-war and new-build estates.

What to expect when we carry out extension pulling away repairs

  1. Show us the junction

    Send photos of the crack outside, the internal corner and any flashing above, with a measure for scale. We give a free initial assessment and an initial view on whether the gap is likely old or still opening.

  2. Find what is moving

    An independent chartered structural engineer can inspect, and we can arrange one. A drain survey under the extension, a trial pit at its footing and tell-tale monitoring across the joint are common checks before choosing the repair.

  3. Choose the fix

    The engineer decides between ties, a movement joint or underpinning. We confirm a fixed price in writing once the repair is specified, covering the junction, flashings, internal finishes and any foundation work.

Is it time for extension pulling away repairs? Common signs

  • A vertical crack or gap where the extension meets the house
  • Daylight or draughts showing through the internal corner joint
  • Floor level dropping where the extension and house floors meet

What should you budget for extension pulling away repairs in Calne?

These are guide prices for Calne, using South West rates and including VAT. Your written quote follows photos or a survey, and is fixed once the repair is specified.

Guide prices inc VAT on South West rates. Items marked est. are our estimates.
ItemGuide pricePer
Junction crack repair with stainless tiesest.£620 – £2,050per junction
Movement joint and making goodest.£410 – £1,250per junction
Underpinning the extension where needed£1,050 – £2,600per metre of wall

Repair options we may recommend

Underpinning the extension

If the extension is still dropping because its footings are too shallow or on poor ground, they are taken deeper by mass concrete, beam-and-base or mini-piles. The engineer designs the scheme, and the junction is repaired once the new foundation is in.

Best for: Active movement from shallow footings, roots or soft ground

Movement joint and making good

Where some seasonal movement is expected to continue, the junction is formed into a proper flexible movement joint with a compressible filler and sealant, so the two parts can move without cracking. Flashings and internal finishes are detailed to suit.

Best for: Minor ongoing movement that does not threaten the structure

Rules for extension pulling away repairs in England

In England, underpinning and other work that alters or strengthens a wall or foundation is building work under the Building Regulations (Part A, structure), so building control approves and inspects it. Like-for-like repairs often are not, and we tell you which applies before a price is agreed. Work to a party wall, or excavation close to a neighbour’s foundations, can also need a notice under the Party Wall etc. Act 1996.

Your extension pulling away repairs questions

How much will extension pulling away repairs cost in Calne?

Guide prices for extension pulling away repairs in Calne start from about £620 per junction, including VAT, on South West rates. Your fixed written price follows photos or a survey and depends on the extent of the work and access.

Do you cover Calne?

We do. Calne and the surrounding area are covered, including nearby Chippenham and Devizes. A free initial assessment from your photos is the first step.

Is the ground in Wiltshire prone to subsidence?

Southern Wiltshire is chalk, while the north around Swindon, Chippenham and Trowbridge sits on Oxford and Kimmeridge Clays that are prone to seasonal movement near trees. Bath stone was mined underground around Corsham. Only an investigation can say why a particular building has moved.

Who is responsible if a recent extension is moving?

If the extension is recent, the original builder, the designer or building control records may be relevant, and you may have rights against the builder. Gather the plans, completion certificate and contract. Insurance often excludes defects in new construction, so check your policy.

What is a movement joint?

A movement joint is a deliberate, flexible break in a wall that lets two parts of a building move slightly without cracking. It is filled with a compressible material and sealed. At an extension junction it can replace a rigid joint that keeps cracking.

Other structural repairs in Calne

Extension pulling away repairs near Calne

For a no-obligation written quote to repair an extension pulling away in Calne, call or send a few photos with a tape measure across the gap.

Next step

Send us photos of the crack or movement

A free initial assessment from your photos, then a no-obligation written quote. If an engineer, drain survey or monitoring is needed first, we say so before you spend anything.

CallGet a quote