Tyne and Wear · England
Extension pulling away repairs in Tyne and Wear
If you live in Tyne and Wear and are looking at extension pulling away repairs, the first question is why the wall moved. Clay soils are found in parts of Tyne and Wear; historic coal workings are recorded beneath parts of Tyne and Wear, and a coal mining search is worth checking where movement is unexplained.
Guide price from£550per junction inc VAT

- Area
- Tyne and Wear
- Pricing region
- North East
- Ground
- Clay in parts
- Towns listed
- 9
What is the ground like in Tyne and Wear?
Tyne and Wear lies on the Durham and Northumberland coalfield, with old shallow workings recorded beneath parts of Newcastle, Gateshead and Sunderland, mostly under a cover of glacial clay.
Historic coal workings are recorded beneath parts of Tyne and Wear, and a coal mining search is worth checking where movement is unexplained. Across Tyne and Wear, most homes are Tyneside flats and terraces, Victorian villas, inter-war council estates and post-war semis.
Extension pulling away repairs prices in Tyne and Wear
Prices in Tyne and Wear are worked out on North East rates. They include VAT and are a starting point: access, the extent of the damage and whether an engineer or building control is involved all move the figure.
| Item | Guide price | Per |
|---|---|---|
| Junction crack repair with stainless tiesest. | £550 – £1,850 | per junction |
| Movement joint and making goodest. | £370 – £1,100 | per junction |
| Underpinning the extension where needed | £920 – £2,300 | per metre of wall |
How we usually approach extension pulling away repairs
Movement joint and making good
Where some seasonal movement is expected to continue, the junction is formed into a proper flexible movement joint with a compressible filler and sealant, so the two parts can move without cracking. Flashings and internal finishes are detailed to suit.
Best for: Minor ongoing movement that does not threaten the structure
Underpinning the extension
If the extension is still dropping because its footings are too shallow or on poor ground, they are taken deeper by mass concrete, beam-and-base or mini-piles. The engineer designs the scheme, and the junction is repaired once the new foundation is in.
Best for: Active movement from shallow footings, roots or soft ground
Junction crack repair with stainless ties
The open joint is cut out, stainless ties or helical bars are fixed across it into both the old and new masonry, and the joint is repointed or rendered to match. Inside, the corner is replastered. This suits extensions that moved once and have since stopped.
Best for: Settled extensions with a stable gap at the junction
What happens during extension pulling away repairs, step by step?
Show us the junction
Send photos of the crack outside, the internal corner and any flashing above, with a measure for scale. We give a free initial assessment and an initial view on whether the gap is likely old or still opening.
Find what is moving
An independent chartered structural engineer can inspect, and we can arrange one. A drain survey under the extension, a trial pit at its footing and tell-tale monitoring across the joint are common checks before choosing the repair.
Repair the junction
Drains are repaired first if they are leaking. The joint is then tied, formed as a movement joint or rebuilt after underpinning, with roof flashings reset so the junction stays watertight. Building control is handled where needed.
What to look for before calling about extension pulling away repairs
- Mastic or render at the joint repeatedly splitting open
- Patio doors or windows in the extension starting to bind
- A vertical crack or gap where the extension meets the house
- Floor level dropping where the extension and house floors meet
Do you need approval for extension pulling away repairs in England?
In England, underpinning and other work that alters or strengthens a wall or foundation is building work under the Building Regulations (Part A, structure), so building control approves and inspects it. Like-for-like repairs often are not, and we tell you which applies before a price is agreed. Work to a party wall, or excavation close to a neighbour’s foundations, can also need a notice under the Party Wall etc. Act 1996.
Extension pulling away repairs near you in Tyne and Wear
- Newcastle upon Tyne
- Sunderland
- South Shields
- Washington
- Wallsend
- Whitley Bay
- Jarrow
- Whickham
- Blaydon-on-Tyne
Questions about extension pulling away repairs in Tyne and Wear
Does the ground around Newcastle upon Tyne cause cracking?
Tyne and Wear lies on the Durham and Northumberland coalfield, with old shallow workings recorded beneath parts of Newcastle, Gateshead and Sunderland, mostly under a cover of glacial clay. Historic coal workings are recorded beneath parts of Tyne and Wear, and a coal mining search is worth checking where movement is unexplained. Only an investigation on site can say why a particular building has moved.
How much will extension pulling away repairs cost in Tyne and Wear?
On North East rates, extension pulling away repairs starts from about £550 per junction, including VAT. The written price depends on the extent of the damage, access and whether an engineer or building control is needed.
Will my extension need underpinning?
Often not. Many separating extensions are fixed by repairing a drain, tying the junction or forming a movement joint. Underpinning is for extensions that keep dropping because their footings are too shallow or the ground beneath is poor, as shown by monitoring.
Who is responsible if a recent extension is moving?
If the extension is recent, the original builder, the designer or building control records may be relevant, and you may have rights against the builder. Gather the plans, completion certificate and contract. Insurance often excludes defects in new construction, so check your policy.
Can a drain under my extension cause it to move?
Yes, a cracked or displaced drain beneath or beside an extension can soften clay or wash away fine soil. A CCTV drain survey usually finds it. Repairing the drain is often the first and most important step before any repair to the walls.