Structural repairs across England, Wales, mainland Scotland and Northern Ireland · Free initial assessment from your photos0800 088 6341

Strood · Kent

Extension pulling away repairs in Strood

If the corner joint in your Strood extension keeps splitting after you fill it, something is still moving. Measuring the gap over a few months, with dated photos, gives an engineer the evidence to recommend the right repair.

Guide price from£670per junction inc VAT

Rear brick extension with a tapered crack at the joint with the house
Postcodes
ME2
Population
about 33,000
Area
Kent
Pricing region
South East

Why does the ground in Kent matter for extension pulling away repairs?

Strood is in Kent and takes in postcode districts ME2. About 33,000 people live there. Neighbouring towns we cover: Gillingham (3 miles), Gravesend (6 miles) and Longfield (8 miles).

Kent is one of the parts of the UK where clay soils are most likely to move with the seasons. Parts of Kent lie on a former coalfield, so a coal mining search is worth checking if movement has no obvious cause. What you mostly find across Kent: Victorian terraces in the Medway towns, weatherboarded and Wealden houses, 1930s semis and seaside bungalows.

From first photo to finished repair

  1. Show us the junction

    Send photos of the crack outside, the internal corner and any flashing above, with a measure for scale. We give a free initial assessment and an initial view on whether the gap is likely old or still opening.

  2. Choose the fix

    The engineer decides between ties, a movement joint or underpinning. We confirm a fixed price in writing once the repair is specified, covering the junction, flashings, internal finishes and any foundation work.

  3. Repair the junction

    Drains are repaired first if they are leaking. The joint is then tied, formed as a movement joint or rebuilt after underpinning, with roof flashings reset so the junction stays watertight. Building control is handled where needed.

Symptoms that point to extension pulling away repairs

  • Daylight or draughts showing through the internal corner joint
  • A vertical crack or gap where the extension meets the house
  • Extension roof flashing lifting off the original wall

Guide prices for extension pulling away repairs in Strood

These are guide prices for Strood, using South East rates and including VAT. Your written quote follows photos or a survey, and is fixed once the repair is specified.

Guide prices inc VAT on South East rates. Items marked est. are our estimates.
ItemGuide pricePer
Junction crack repair with stainless tiesest.£670 – £2,250per junction
Movement joint and making goodest.£450 – £1,350per junction
Underpinning the extension where needed£1,100 – £2,800per metre of wall

Methods for extension pulling away repairs

Junction crack repair with stainless ties

The open joint is cut out, stainless ties or helical bars are fixed across it into both the old and new masonry, and the joint is repointed or rendered to match. Inside, the corner is replastered. This suits extensions that moved once and have since stopped.

Best for: Settled extensions with a stable gap at the junction

Underpinning the extension

If the extension is still dropping because its footings are too shallow or on poor ground, they are taken deeper by mass concrete, beam-and-base or mini-piles. The engineer designs the scheme, and the junction is repaired once the new foundation is in.

Best for: Active movement from shallow footings, roots or soft ground

Rules for extension pulling away repairs in England

In England, underpinning and other work that alters or strengthens a wall or foundation is building work under the Building Regulations (Part A, structure), so building control approves and inspects it. Like-for-like repairs often are not, and we tell you which applies before a price is agreed. Work to a party wall, or excavation close to a neighbour’s foundations, can also need a notice under the Party Wall etc. Act 1996.

Frequently asked questions

How much will extension pulling away repairs cost in Strood?

Guide prices for extension pulling away repairs in Strood start from about £670 per junction, including VAT, on South East rates. Your fixed written price follows photos or a survey and depends on the extent of the work and access.

Do you cover Strood?

Yes. We take enquiries from across Strood, including ME2, and from nearby places such as Gillingham and Gravesend. Send photos for a free initial view and we will tell you what happens next.

Is the ground in Kent prone to subsidence?

North Kent sits on London Clay, central Kent on Gault and Weald Clays and the Downs on chalk, so shrinkable clay is widespread. East Kent around Deal and Dover had a small deep coalfield, worked until the late 1980s. Only an investigation can say why a particular building has moved.

Can a drain under my extension cause it to move?

Yes, a cracked or displaced drain beneath or beside an extension can soften clay or wash away fine soil. A CCTV drain survey usually finds it. Repairing the drain is often the first and most important step before any repair to the walls.

Who is responsible if a recent extension is moving?

If the extension is recent, the original builder, the designer or building control records may be relevant, and you may have rights against the builder. Gather the plans, completion certificate and contract. Insurance often excludes defects in new construction, so check your policy.

Other structural repairs in Strood

Extension pulling away repairs near Strood

For a no-obligation written quote to repair an extension pulling away in Strood, call or send a few photos with a tape measure across the gap.

Next step

Send us photos of the crack or movement

A free initial assessment from your photos, then a no-obligation written quote. If an engineer, drain survey or monitoring is needed first, we say so before you spend anything.

CallGet a quote